PHOTO1  PHOTO2

 

ALICE (Homepage)

bar6.gif (5391 bytes)

PIXEL CARRIER (version A)

This version is the first prototype of the PIXEL_CARRIER (6 layers Cu). The ladders are glued on the bus.

Pixel_carrier glued on interface card with protection and fans (the chips are glued on the bus)

 

   The pixel carrier is glued on an interface card. 10 pixel chips are glued and bonded on this carrier.

 

 Detail of a pixel_chip bonded on the pixel_carrier

 

 *** Click on the pictures to enlarge***

bar6.gif (5391 bytes)

PIXEL CARRIER (version B)

This version is the second prototype of the PIXEL_CARRIER (4 power planes layers Aluminium ) and  (3 signal layers copper).

Pictures: (click to enlarge)

                                                            

7 layers Pixel bus mirror                                                    Pixel  bus mirror (equipped with 2 ladders) glued on the interface

 

 

 

bar6.gif (5391 bytes)

PIXEL BUS  2004

 

 Pixel bus and Pilot MCM 2004

Mechanical Pixel bus and Pilot MCM drawings 2004 (pdf)

Details between Bus & MCM (pdf)

  Picture of Pixel bus 2004 glued on the Ladders (2 Al power planes + 3 Cu signal layers)

 

bar6.gif (5391 bytes)

PIXEL BUS 2005

 Pixel bus and Pilot MCM 2005 (ppt)Last modifications on the bus and MCM

How it is done? (document in french)

You can find details on https://edms.cern.ch/cedar/plsql/fullsearch.doc_search

EDA-00332-V3 pixel bus Right

EDA-00427-V2 pixel bus Left

Picture of  Aluminium Pixel bus 2005 glued on the Ladders and connected to MCM

bar6.gif (5391 bytes)

PILOT MCM (FR4 version)

 

bar6.gif (5391 bytes)

PILOT MCM (ceramic version)

bar6.gif (5391 bytes)

PILOT MCM (SBU version)

 

MCM right equipped with RX40 chip

 

MCM right with swapped between Digital Pilot and GOL

MCM right mounted on the test card connected to the MPT

Technical specifications of the SBU Pilot MCM 

    Details on EDMS

     https://edms.cern.ch/cedar/plsql/fullsearch.doc_search: (In search window) EDA-00638 MCM Right or  EDA-00732 MCM Left

    MCM test results and location: mcm_test_results

    PILOT_MCM production  (.doc)

bar6.gif (5391 bytes)

HALF_STAVES details

                       

 

*** Click on the pictures to enlarge***

bar6.gif (5391 bytes)

CABLES & PATCH PANELS

 

    * SPD cable length and racks location

       * SPD PATCH PANEL (location 0, 1, 4)

       * SPD PATCH PANEL (location 2, 3)

 * cables DSF

       * cables HT DSF

                                                     

                         PP1 sector 9 Patch Panel closed                        PP1 sector 9 (Patch Panel is opened)

*** Click on the pictures to enlarge***

bar6.gif (5391 bytes)

OPTICAL PATCH PANELS

* Optical Patch Panels (CR4 & PP5)

* Optical Patch Panels (PP0)

* Optical Patch Panels (PP1)

* Optical Patch panel (PP1 to PP2)

* Optical Patch Panels (PP0T under TPC)

* Glink measurements done in CR4 and |Trigger Crate (June 2008)

* Power margins measurements on side A (07/2009)

bar6.gif (5391 bytes)

Humidity sensors placed under ITS

 

http://alicedcs.web.cern.ch/AliceDCS/monitoring/main.aspx

 

 

bar6.gif (5391 bytes)

 

sectors in DSF

                    

 

 Sector measurements

 

SPD in the PIT

 

bar6.gif (5391 bytes)

 List of the CAEN modules installed in the PIT

 

bar6.gif (5391 bytes)

 meeting presentations

 

Top page